>> lagbary_interp_1d_test 18-Aug-2012 16:16:40 LAGBARY_INTERP_1D_TEST: MATLAB version Test the LAGBAR_INTERP_1D library. These tests need the TEST_INTERP_1D libraries. LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 -1 2: -0.382683 -1 3: 0.382683 2 4: 0.92388 1 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 -1 2: -0.83147 -1 3: -0.55557 -1 4: -0.19509 -1 5: 0.19509 -1 6: 0.55557 2 7: 0.83147 1 8: 0.980785 1 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 3.77164 2: -0.382683 2.14805 3: 0.382683 0.296101 4: 0.92388 3.54328 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 3.94236 2: -0.83147 3.49441 3: -0.55557 2.66671 4: -0.19509 1.58527 5: 0.19509 0.414729 6: 0.55557 1.33342 7: 0.83147 2.98882 8: 0.980785 3.88471 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 5658 2: -0.382683 192.863 3: 0.382683 0.00935799 4: 0.92388 -1.17481 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 7328.93 2: -0.83147 3617.02 3: -0.55557 727.153 4: -0.19509 25.4631 5: 0.19509 0.410606 6: 0.55557 0.801553 7: 0.83147 0.353595 8: 0.980785 -0.732265 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 -1.55155 2: -0.382683 -1.53781 3: 0.382683 0.298175 4: 0.92388 1.52528 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 -1.55236 2: -0.83147 -1.55008 3: -0.55557 -1.54394 4: -0.19509 -1.52697 5: 0.19509 -1.43272 6: 0.55557 1.43322 7: 0.83147 1.51608 8: 0.980785 1.52955 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 -7.87761 2: -0.382683 3.83561 3: 0.382683 3.83561 4: 0.92388 -7.87761 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 7.8564 2: -0.83147 -6.4622 3: -0.55557 -1.11816 4: -0.19509 10.8444 5: 0.19509 10.8444 6: 0.55557 -1.11816 7: 0.83147 -6.4622 8: 0.980785 7.8564 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 2.65903e-10 2: -0.382683 0.00165391 3: 0.382683 0.754516 4: 0.92388 0.000699029 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 2.9776e-11 2: -0.83147 7.46363e-09 3: -0.55557 3.09513e-05 4: -0.19509 0.0420168 5: 0.19509 0.952904 6: 0.55557 0.22448 7: 0.83147 0.00447293 8: 0.980785 0.000194563 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 0.0248346 2: -0.382683 0.216377 3: 0.382683 4.62157 4: 0.92388 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 0.0197789 2: -0.83147 0.0359409 3: -0.55557 0.108362 4: -0.19509 0.45824 5: 0.19509 2.18226 6: 0.55557 0 7: 0.83147 0 8: 0.980785 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 1 spacing for data points. Number of data points = 4 Data array: 1: -0.92388 0.00490814 2: -0.382683 0.0126722 3: 0.382683 0.420819 4: 0.92388 0.0527221 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby1_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 1 spacing for data points. Number of data points = 8 Data array: 1: -0.980785 0.00453983 2: -0.83147 0.00560912 3: -0.55557 0.00889499 4: -0.19509 0.0202778 5: 0.19509 0.0971157 6: 0.55557 0.764056 7: 0.83147 0.0834222 8: 0.980785 0.0414672 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby1_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 1 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby1_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 1 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby1_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 1 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby1_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 -1 2: -0.5 -1 3: 0.5 2 4: 1 1 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 -1 2: -0.900969 -1 3: -0.62349 -1 4: -0.222521 -1 5: 0.222521 -1 6: 0.62349 2 7: 0.900969 1 8: 1 1 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #1. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p01_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 4 2: -0.5 2.5 3: 0.5 1 4: 1 4 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 4 2: -0.900969 3.70291 3: -0.62349 2.87047 4: -0.222521 1.66756 5: 0.222521 0.332437 6: 0.62349 1.74094 7: 0.900969 3.40581 8: 1 4 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #2. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p02_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 7977.2 2: -0.5 492.075 3: 0.5 0.35 4: 1 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 7977.2 2: -0.900969 5080.63 3: -0.62349 1130.38 4: -0.222521 36.4669 5: 0.222521 0.418951 6: 0.62349 1.39033 7: 0.900969 -0.914163 8: 1 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #3. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p03_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 -1.55262 2: -0.5 -1.54223 3: 0.5 1.3734 4: 1 1.53082 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 -1.55262 2: -0.900969 -1.55121 3: -0.62349 -1.54576 4: -0.222521 -1.52898 5: 0.222521 -1.40829 6: 0.62349 1.47053 7: 0.900969 1.5233 8: 1 1.53082 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #4. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p04_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 13.3791 2: -0.5 3.41326 3: 0.5 3.41326 4: 1 13.3791 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 13.3791 2: -0.900969 -3.05842 3: -0.62349 8.46674 4: -0.222521 2.59504 5: 0.222521 2.59504 6: 0.62349 8.46674 7: 0.900969 -3.05842 8: 1 13.3791 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #5. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p05_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 1.38879e-11 2: -0.5 0.00012341 3: 0.5 0.367879 4: 1 0.00012341 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 1.38879e-11 2: -0.900969 6.23502e-10 3: -0.62349 4.99162e-06 4: -0.222521 0.0280879 5: 0.222521 0.987991 6: 0.62349 0.107323 7: 0.900969 0.00113608 8: 1 0.00012341 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #6. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p06_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 0.0183156 2: -0.5 0.135335 3: 0.5 0 4: 1 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 0.0183156 2: -0.900969 0.027218 3: -0.62349 0.0825824 4: -0.222521 0.410621 5: 0.222521 2.43533 6: 0.62349 0 7: 0.900969 0 8: 1 0 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #7. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p07_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 2 spacing for data points. Number of data points = 4 Data array: 1: -1 0.00442478 2: -0.5 0.00990099 3: 0.5 1 4: 1 0.0384615 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby2_04.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 2 spacing for data points. Number of data points = 8 Data array: 1: -1 0.00442478 2: -0.900969 0.00506916 3: -0.62349 0.00786022 4: -0.222521 0.0187957 5: 0.222521 0.11495 6: 0.62349 0.396044 7: 0.900969 0.0585562 8: 1 0.0384615 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby2_08.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 2 spacing for data points. Number of data points = 16 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby2_16.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 2 spacing for data points. Number of data points = 32 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby2_32.png". LAGBARY_INTERP_1D_TEST01: Interpolate data from TEST_INTERP_1D problem #8. Use Chebyshev Type 2 spacing for data points. Number of data points = 64 L2 interpolation error averaged per interpolant node = 0 Created plot file "p08_lagcheby2_64.png". LAGBARY_INTERP_1D_TEST: Normal end of execution. 18-Aug-2012 16:17:00 >>