31 August 2018 10:44:45 PM QUADRATURE - Master process: C version An MPI example program. Estimate the value of PI by approximating an integral. The integral is approximated by a sum, whose calculation is divided among a number of processes. Compiled on Aug 31 2018 at 22:44:45. The number of processes available is 4. QUADRATURE - Master process: Number of intervals used is 1000. QUADRATURE - Process 0: Points used = 250 Estimate 0.786148. QUADRATURE - Process 2: Points used = 250 Estimate 0.785148. QUADRATURE - Process 3: Points used = 250 Estimate 0.784648. QUADRATURE - Process 1: Points used = 250 Estimate 0.785648. QUADRATURE - Master process: Integral estimate 3.1415927369231262 The exact value is 3.1415926535897931 The error is 0.0000000833333331 Wall clock elapsed seconds = 0.000115 QUADRATURE - Master process: Normal end of execution. 31 August 2018 10:44:45 PM